We collaborate with students, parents, teachers and schools

About QuestionsToday
QuestionsToday is a concept-based learning platform powered by AI, built for students, parents, teachers, and schools. We use concept-testing as a tool to assess how well students have understood a concept and identify learning gaps by analyzing their strong and weak areas at a granular level. At present, we cater to grades 1 to 12, across all countries. Our approach is to put students on a continuous improvement cycle, building confidence and competitiveness in the process.
QuestionsToday is meant for students of all countries. We have country-specific content except for STEM (science, technology, engineering, mathematics) and few other subjects which are universal.
Our Mission
We believe every student can excel, if the required guidance and inputs are provided in a student-centric approach. Grades 1 to 12 are the foundation years for knowledge. Clear concepts, evolving from one grade to the next, are a stepping stone for greater achievements in college and career. Our mission is merely to enable every student to achieve those heights. If students go for it, and are supported by their parents and teachers, they can be unstoppable.
As every student is unique, the method to evaluate their strengths and weaknesses needs to be personalized too. All our features are built on intelligence to achieve this.

Stakeholders
Parents (or guardians) and teachers are the two most important pillars of support and strength for students. Our model for schools and parent/tuition groups is designed to involve them as stakeholders in regular tracking of each student's performance at a granular level. We test concepts for every topic in different subject areas so that we can analyze a student's performance intelligently, accurately and in detail. Parents can see how their wards are doing, and teachers can check the performance of an entire grade or a specific student as necessary.
The school/group account in QuestionsToday comes with an interface for students, parents and teachers, each with their unique features.

What makes us different?
We do not teach because that is the rightful domain of schools, teachers and books. What we do is test what a student has learnt. It is the learning outcome we target and help students achieve it progressively from grade to grade. We also help teachers identify the weak areas of students so that corrective action can be taken promptly. The biggest risk for students is to reach the next grade with unclear concepts taught earlier. If this accumulates, it might become extremely stressful for students to cope after a point.
QuestionsToday has an auto-pilot design. Topics, questions, assessments, evaluation, scoring, the need for re-assessments and intelligence on a student's strenghts and weaknesses is automated from start to finish.

Concept Versus Curriculum
People generally focus on curriculum and syllabus. That's how our minds are conditioned because that has been the practice for ages. Since college and career options are paramount in our minds - for a better future - knowledge matters only to that extent. It is perhaps the most practical measure of 'learning outcomes' for people at large.
We agree with this approach, but we also believe that if concepts are clear, one can achieve the desired outcomes with better results. If one has clear comprehension of a topic, curriculum and syllabus really do not matter.
QuestionsToday prompts students to assess their concepts periodically. It also continues the same topics in future grades for revision and practice. Our questions are different each time, going wide and deep into each topic.

Our Story
Our youngest co-founder is 18 years old and the oldest over 50. By qualification and profession, we are a team of designers, computer science professionals and educators. We have dealt with student problems first-hand and understand the importance of concept-based learning as a sustainable long-term approach for better outcomes. If one has to get into the 'rat race' eventually, competitiveness is key. This is the main focus area in our features, our extensive use of AI and future roadmap. Our motto is evolution, continuous and forever.
QuestionsToday is incorporated as a private limited company in India. It has a board of directors and is governed by the Ministry of Corporate Affairs, India.
